电缆沟工程项目承包合同(精选13篇)
《电缆沟工程项目承包合同(精选13篇)》由会员分享,可在线阅读,更多相关《电缆沟工程项目承包合同(精选13篇)(71页珍藏版)》请在启牛文库网上搜索。
1、电缆沟工程项目承包合同(精选13篇)电缆沟工程项目承包合同 篇1甲方(发包单位):Party A ( Employer )乙方(承包单位):Party B (Contractor )鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;鉴于乙方系具有施工资质的工程建设单位,愿意依照招标文件所规定的质量要求分包电缆沟施工项目并完成;为了按期完成合同段工程,经双方协商,在遵守总合同的基础上,根据中华人民共和国民法典和建设工程法律法规中的有关规定,由乙方承包本工程工程项目。为明确双方的权利、义务,特签订本合同,以共同遵守。WHEREAS party A have,
2、with the Owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;WHEREAS party B is the qualified constructor, be willing, in accordance with the quality requirement of bidding documents, to subcontract
3、and complete the project;This Contract: For the purpose of accomplishment of the contracted engineering, parties hereto, through negotiation and on the basis of complying with the general contract, in accordance with LAW OF CONTRACT and relevant regulations of laws and rules on construction engineer
4、ing, agree to award this project to party B for completion.IN FAITH WHEREOF, to specify parties hereof s rights and liabilities, make and enter into this contract hereby for abidance by parties.一、工程概况及承包内容 Project Overview and Contracting Works1.1工程名称及概况:工程名称:电缆沟工程。 本工程涉及三个变电站,分别是现有的220/35kV A472变电站
5、、现有的35/10kV B301S变电站以及新建的35/10kV C581变电站。工作内容为三个变电站之间和从三个变电站接至MV用户的电力电缆、控制电缆、接地电缆敷设所需电缆沟的开挖工程。Name of Project and Overview: Name of Cable Trench;The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S and a new 35/10kV C581 substation. Work co
6、ntents are the excavation Works of trenches, between three substations and from the locations of three substations to MV user, which are necessary for laying out power cable, control cable, earth cable.This is the power, control and grounding cable trench excavation project among three substations a
7、nd for MV users connected to the three substations.1.2 合同形式:本合同单价为综合单价,采取固定单价承包方式。固定单价承包单价为乙方在本合同约定工期内完工的结算依据,不作任何调整。Contracting form: Unit price hereof is subject to the comprehensive unit price, contracted form is fixed unit price. Fixed price of contracted project is the settlement basis of party
8、 Bs completion within the work period stipulated hereof, without any adjustment.1.3 工程范围内全部电缆沟工程,包括:电缆沟施工:沟底整平夯实、垫层(砂砾、碎石垫层夯实),钢筋(包括电缆沟盖板钢筋、墙帽钢筋、电缆沟检查井盖板钢筋、墙身预埋钢筋、吊装预埋钢筋、镀锌钢筋等所有部位)的防锈、除锈、制作、绑扎、钢筋的损耗等;施工支架的安装与拆除、模板(钢模)的安装与拆除、预埋件的制作与安装、外露钢板的防腐处理、角钢支架(包含电缆竖架及电缆横架)的制作与安装,砼的浇筑及养生(包括基础、墙帽、沟盖板等),电缆沟开挖等与此工程